LOADING...

Water in Abundance

In our Abagold newsletter of 1 December, we reported on the pipeline  project which was commissioned on 6 October 2009. In order to pump more water to Bergsig farm and save electricity at the same time, a new 700mm pipeline of 450 metres in length was required. This new pipe was routed from the Sea View pumphouse, across the farm and all the way around the perimeter of Bergsig. Read More